Skip to content
Hexwave Lab
Product design

Costing manual quality inspection on the production floor

Hexwave Lab  ·  Field note

Capture the rejection reason and the evidence a second inspector needs to reproduce the decision.

Include the work after a defect is noticed. An operator may stop the line, log the observation, move the item and wait for a second opinion. Timing the visual check alone misses most of the cost of an uncertain result.

A worked scenario

An inspection station flags a manufactured item for a second review.

Review stageExample
Source recordsThe captured image, batch record and inspection criterion
ExceptionThe lighting has changed since the reference image was recorded
Acceptance conditionThe second reviewer can inspect the evidence and record the actual disposition

Describe the event on the factory floor

Follow one work order from release through inspection. Record machine time, operator intervention and time waiting for material separately. Combining these intervals can obscure whether the constraint is equipment, coordination or the supply schedule.

Test the record at shift change. A second operator should understand the current state, why an intervention happened and what evidence is needed before returning the equipment or batch to normal operation.

Tie visual review to a physical decision

Define what the image shows, the conditions under which it is captured and the action a reviewer can take. Lighting, camera position and material variation belong in the evaluation sample. Keep a path for uncertain observations to receive a second inspection.

Test images captured during different shifts or with a changed background. If the decision changes, inspect the evidence before assuming the part itself is different.

Measure the work before changing it

Choose a unit a reviewer can recognize, such as one case resolved or one document approved. Follow that unit from arrival to completion. Record active handling time, time spent waiting and the number of times somebody had to return it for clarification.

Use a consistent observation window and include exceptions. An average drawn only from clean records can make a new system look successful while the unresolved queue grows.

Putting it into practice

Measure false holds and missed defects separately during a trial. Ask production and quality teams how each type changes rework, throughput and the disposition of the batch.

Explore Hexwave Lab’s approach to digital product development.

Hexwave Lab

Plan a discovery call

Scheduling will open once a booking calendar is connected. You can prepare your project brief on the contact page.

Prepare a brief